Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 23 results ...

Abbiasov, T (2021) Essays in Urban Economics, Unpublished PhD Thesis, , Columbia University.

Asgari, S (2016) Modeling construction competitive bidding: An agent-based approach, Unpublished PhD Thesis, , Columbia University.

Chang, H-H (2002) N-dimensional construction management information system (NDCON): System design and performance modeling through the zero -buffered project management philosophy, Unpublished PhD Thesis, , Columbia University.

Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system, Unpublished PhD Thesis, , Columbia University.

Chiara, N (2006) Real option methods for improving economic risk management in infrastructure project finance, Unpublished PhD Thesis, , Columbia University.

Fitch, G J (2019) System dynamics models for the valuation of real options in infrastructure investments, Unpublished PhD Thesis, , Columbia University.

Gerstenberger, A J (2021) Modeling the likelihood of construction incidents using public data, Unpublished PhD Thesis, , Teachers College, Columbia University.

Gocmen, F C (2014) Infrastructure scaling and pricing, Unpublished PhD Thesis, , Columbia University.

He, Y (2006) Earthquake loss and risk estimation of buildings by Monte Carlo simulation, Unpublished PhD Thesis, , Columbia University.

Hogan, D B (1998) Modeling construction cost performance: A comprehensive approach using statistical, artificial neural network and simulation methods, Unpublished PhD Thesis, , Columbia University.

Kokkaew, N (2010) Risk flexibility analysis in infrastructure project finance, Unpublished PhD Thesis, , Columbia University.

Li, W (1995) Benefit and cost analysis: Three-dimensional computer models with integrated databases in the management of construction, Unpublished PhD Thesis, , Columbia University.

Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security, Unpublished PhD Thesis, , Columbia University.

Silver, M L (1981) Craft production: Work and alienation in the construction industry, Unpublished PhD Thesis, , Columbia University.

Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes, Unpublished PhD Thesis, , Columbia University.

Sturts, C S (2001) Value-bidding: An integrative approach utilizing conjoint analysis and classical bidding theory, Unpublished PhD Thesis, , Columbia University.

Subsomboon, K (2004) A procurement and material management (PMM) system based on the fully integrated and automated project process (FIAPP), Unpublished PhD Thesis, , Columbia University.

  • Type: Thesis
  • Keywords: efficiency; project team; construction project; automation; bidding; collaboration; construction procurement; materials management; monitoring; project delivery; case studies; simulation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305207515
  • Abstract:
    Over the last decade, the Fully Integrated and Automated Project Process (FIAPP) has emerged as a model for integrating construction project participants and improving project development efficiency. FIAPP's potential, however, has yet to be realized, in part, because particular information and management systems remain undeveloped. One of the missing pieces is a procurement model to support FIAPP during the building construction procurement process. Moreover, the impacts of a FIAPP-based system on traditional project delivery—DBB (design-bid-build)—for building construction has been difficult to quantify. Therefore, this research fills these two voids. First, a prototype procurement and materials management system, called 3DPMM, was developed and tested in practice. 3DPMM is used in conjunction with a 3D model to enable a project team to visually record and retrieve information related to the procurement of material. For instance, one feature of 3DPMM is its material-status monitoring system where 3D objects are “color-coded” according to their procurement status. The system was successfully tested and evaluated during three case studies in New York City. Second, a simulation model was constructed to quantify the impacts of 3DPMM when applied to the procurement of fabricated materials on the DBB process for building construction. This model quantified the cycle time and process cost of traditional and 3DPMM procurement processes. The research shows that the benefits attributable to 3DPMM are significant. Implementation of the 3DPMM and FIAPP based technology can result in significant improvements in efficiency, automation and project collaboration as well as time and cost savings on the design, bidding, and construction processes.

Sun, W (2023) A self-localized smart hardhat system for construction 4.0, Unpublished PhD Thesis, , Columbia University.

Tavakolan, M (2011) Development of construction projects scheduling with evolutionary algorithms, Unpublished PhD Thesis, , Columbia University.

Teferra, K (2012) Developments in the theory and applications of the variability response function concept, Unpublished PhD Thesis, , Columbia University.

Ucbenli, C (2010) A bargaining mechanism with incomplete information and its application in trilateral BOT negotiations, Unpublished PhD Thesis, , Columbia University.

Unsal, H I (2010) Modeling the hold-up problem and absorptive capacity of project networks, Unpublished PhD Thesis, , Columbia University.

Wang, W (2010) Multivariate stochastic copula-based deterioration models in infrastructure economic risk management, Unpublished PhD Thesis, , Columbia University.